Alien.
Add to clipboard
Alien.
STS-3 launch, switcher out.
Add to clipboard
STS-3 launch, switcher out.
The changing world of Electrohome.
Add to clipboard
The changing world of Electrohome.
Raw footage.
Add to clipboard
Raw footage.
Electronics contract assembly, PCB assembly, metal plant.
Add to clipboard
Electronics contract assembly, PCB assembly, metal plant.
Electrohome "Advent 750" cass. demo, 2 x 7.00 min. ENG.
Add to clipboard
Electrohome "Advent 750" cass. demo, 2 x 7.00 min. ENG.
Electrohome Advent presentation, 2 x 7 min.
Add to clipboard
Electrohome Advent presentation, 2 x 7 min.
John Pollock 750 demo, #1.
Add to clipboard
John Pollock 750 demo, #1.
PV : copy of presentation.
Add to clipboard
PV : copy of presentation.
Out on the edge.
Add to clipboard
Out on the edge.
Lowater & the ECP 1000.
Add to clipboard
Lowater & the ECP 1000.
Wide shots, wave solder, dip inspector, sequencer.
Add to clipboard
Wide shots, wave solder, dip inspector, sequencer.
Navy Seals scenes.
Add to clipboard
Navy Seals scenes.
Electrohome historic & future modules : PAL version.
Add to clipboard
Electrohome historic & future modules : PAL version.
Electrohome Electronics, #1.
Add to clipboard
Electrohome Electronics, #1.
Circa 75 Electrohome.
Add to clipboard
Circa 75 Electrohome.
The Bahamas : "it's better in the Bahamas."
Add to clipboard
The Bahamas : "it's better in the Bahamas."
Panasonic video S-VHS : get about Australia (NTSC).
Add to clipboard
Panasonic video S-VHS : get about Australia (NTSC).
ADRI MARKUS (ALS).
Add to clipboard
ADRI MARKUS (ALS).
STS-2 astro arrival, breakfast, suit-up, caravan, white room.
Add to clipboard
STS-2 astro arrival, breakfast, suit-up, caravan, white room.
Electrohome shuttle coverage #2 : countdown to T-31 second HOLD.
Add to clipboard
Electrohome shuttle coverage #2 : countdown to T-31 second HOLD.
Gully erosion ; Barleyhead weeds ; Elora Gorge from bridge / Summit Productions [for the Grand River Conservation Authority].
Add to clipboard
Gully erosion ; Barleyhead weeds ; Elora Gorge from bridge / Summit Productions [for the Grand River Conservation Authority].
Annual report : masters, 1981-1985.
Add to clipboard
Annual report : masters, 1981-1985.
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 1 of 2)
Add to clipboard
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 1 of 2)
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 2 of 2)
Add to clipboard
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 2 of 2)
GRCA information night, Paris, June 5, 1981 / recorded by Jarmain Cable TV, Brantford, print #1.
Add to clipboard
GRCA information night, Paris, June 5, 1981 / recorded by Jarmain Cable TV, Brantford, print #1.
Electrohome shuttle coverage #4 : launch coverage from stands & NASA feed.
Add to clipboard
Electrohome shuttle coverage #4 : launch coverage from stands & NASA feed.
Resource management camp / Summit Film Productions [for the Grand River Conservation Authority], September 28, 1981.
Add to clipboard
Resource management camp / Summit Film Productions [for the Grand River Conservation Authority], September 28, 1981.
GRCA videocassettes transferred to DVDs.
Add to clipboard
GRCA videocassettes transferred to DVDs.
On its own.
Add to clipboard
On its own.
Complete STS-1 mission, 1st arrival thru return to OPF, March 24, 1979, April 29, 1981.
Add to clipboard
Complete STS-1 mission, 1st arrival thru return to OPF, March 24, 1979, April 29, 1981.
STS-2 isolated cameras : copy.
Add to clipboard
STS-2 isolated cameras : copy.
STS-2 unedited (master) landing, Nov. 14, 1981.
Add to clipboard
STS-2 unedited (master) landing, Nov. 14, 1981.
STS-2 SRB recovery, 4 1/2 min. audio ch. 1, Nov. 17, 1981.
Add to clipboard
STS-2 SRB recovery, 4 1/2 min. audio ch. 1, Nov. 17, 1981.
Electrohome shuttle coverage #1 : pre-launch coverage.
Add to clipboard
Electrohome shuttle coverage #1 : pre-launch coverage.
Corporate film : the changing world of Electrohome : print #3.
Add to clipboard
Corporate film : the changing world of Electrohome : print #3.
Flooding / [Summit Film Productions for the Grand River Conservation Authority].
Add to clipboard
Flooding / [Summit Film Productions for the Grand River Conservation Authority].
Grand River Conservation Authority : annual reports , 1981 to 1986 (disc 1 of 2).
Add to clipboard
Grand River Conservation Authority : annual reports , 1981 to 1986 (disc 1 of 2).
Corporate film : the changing world of Electrohome : print #2.
Add to clipboard
Corporate film : the changing world of Electrohome : print #2.
The changing world of Electrohome : print #1.
Add to clipboard
The changing world of Electrohome : print #1.
Electrohome shareholder presentation, May, 1981.
Add to clipboard
Electrohome shareholder presentation, May, 1981.
STS-2 landing, Nov. 14, 1981.
Add to clipboard
STS-2 landing, Nov. 14, 1981.
Electrohome shuttle coverage #3 : pre-launch coverage second try.
Add to clipboard
Electrohome shuttle coverage #3 : pre-launch coverage second try.
The changing world of Electrohome.
Add to clipboard
The changing world of Electrohome.
Electrohome 75th anniversary presentation : "people."
Add to clipboard
Electrohome 75th anniversary presentation : "people."
NASA/KSC video release, Nov. 30, 1982 : STS-6 Challenger move from OPF to VAB for stacking and mate then roll to pad-39 & chopper.
Add to clipboard
NASA/KSC video release, Nov. 30, 1982 : STS-6 Challenger move from OPF to VAB for stacking and mate then roll to pad-39 & chopper.
The AABEX story : dubbed April, 1982.
Add to clipboard
The AABEX story : dubbed April, 1982.
The AABEX story : dubbed for Electrohome.
Add to clipboard
The AABEX story : dubbed for Electrohome.
The AABEX story : dubbed April, 1982.
Add to clipboard
The AABEX story : dubbed April, 1982.
Electrohome 75th anniversary presentation : "people."
Add to clipboard
Electrohome 75th anniversary presentation : "people."
Camp Clover.
Add to clipboard
Camp Clover.
Guelph Dam : micro hydro opening ceremony, 1982 : print #1 / Maclean Hunter Cable TV, Channel 8 cablecast, Guelph.
Add to clipboard
Guelph Dam : micro hydro opening ceremony, 1982 : print #1 / Maclean Hunter Cable TV, Channel 8 cablecast, Guelph.
Feb. 25, 1982 : Westar D/Delta 106 launch time 7:04 pm-EST., switcher out + Westar showing.
Add to clipboard
Feb. 25, 1982 : Westar D/Delta 106 launch time 7:04 pm-EST., switcher out + Westar showing.
CAP control room, CFCA, CKKW control rooms, warehouse exteriors with trucks, Deilcraft exteriors, Deilcraft interiors, raw lumber, crating furniture, etc.
Add to clipboard
CAP control room, CFCA, CKKW control rooms, warehouse exteriors with trucks, Deilcraft exteriors, Deilcraft interiors, raw lumber, crating furniture, etc.
Wellington Street employees walking out, engineering, drafting, AABEX.
Add to clipboard
Wellington Street employees walking out, engineering, drafting, AABEX.
STS-3, Mar. 30, 1982 : landing, SW.O.
Add to clipboard
STS-3, Mar. 30, 1982 : landing, SW.O.
The AABEX story : dubbed April, 1982.
Add to clipboard
The AABEX story : dubbed April, 1982.
"People" : 75th anniversary.
Add to clipboard
"People" : 75th anniversary.
Electrohome tape #4 : 75th anniversary.
Add to clipboard
Electrohome tape #4 : 75th anniversary.
NASA/KSC video release, September 15, 1982 : STS-4, the final test flight.
Add to clipboard
NASA/KSC video release, September 15, 1982 : STS-4, the final test flight.
Electrohome #7 (not finished), switchboard, mailroom, computer, circuit boards, TVs being tested, computer room.
Add to clipboard
Electrohome #7 (not finished), switchboard, mailroom, computer, circuit boards, TVs being tested, computer room.
The AABEX story : dubbed April, 1982.
Add to clipboard
The AABEX story : dubbed April, 1982.
Electrohome tape #4 : 75th anniversary.
Add to clipboard
Electrohome tape #4 : 75th anniversary.
Deilcraft interiors, furniture assembly showroom, Motor Division interiors.
Add to clipboard
Deilcraft interiors, furniture assembly showroom, Motor Division interiors.
Dubner Graphics : ECP projector, productive information technoloyg, various Dubner examples.
Add to clipboard
Dubner Graphics : ECP projector, productive information technoloyg, various Dubner examples.
NASA/KSC STS-3 : the complete mission, April 12, 1982, Newton/Cottee version.
Add to clipboard
NASA/KSC STS-3 : the complete mission, April 12, 1982, Newton/Cottee version.
NASA/KSC May 26, 1982 : Columbia, STS-4 roll out to pad.
Add to clipboard
NASA/KSC May 26, 1982 : Columbia, STS-4 roll out to pad.
NASA/KSC video release, Sept. 15, 1982 : STS-4, the final test flight.
Add to clipboard
NASA/KSC video release, Sept. 15, 1982 : STS-4, the final test flight.
Electrohome : people - Tenessee.
Add to clipboard
Electrohome : people - Tenessee.
People, 75th anniversary.
Add to clipboard
People, 75th anniversary.
STS-6 Downlink Spacecraft TV, April 4, 6, 1983.
Add to clipboard
STS-6 Downlink Spacecraft TV, April 4, 6, 1983.
NASA/KSC video release, April 15, 1983 : STS-6 Challenger 15 min. tape pre-launch, launch, sat. dep. EVA and landing.
Add to clipboard
NASA/KSC video release, April 15, 1983 : STS-6 Challenger 15 min. tape pre-launch, launch, sat. dep. EVA and landing.
B reel - ECP 1000.
Add to clipboard
B reel - ECP 1000.
"A"/2 ECP 1000.
Add to clipboard
"A"/2 ECP 1000.
ECP 1000 road show, 2 cuts : Dave Lowater, Anahiem : low audio.
Add to clipboard
ECP 1000 road show, 2 cuts : Dave Lowater, Anahiem : low audio.
Dealer versions of "blue TV" and "alien."
Add to clipboard
Dealer versions of "blue TV" and "alien."
Electrohome, reel 2, 64 spots.
Add to clipboard
Electrohome, reel 2, 64 spots.
On its own.
Add to clipboard
On its own.
NASA/KSC video release, April 6, 1983 : STS-6 Challenger pre-launch, launch and isolated cameras.
Add to clipboard
NASA/KSC video release, April 6, 1983 : STS-6 Challenger pre-launch, launch and isolated cameras.
NASA/KSC video release, May 26, 1983 : STS-7 Challenger, roll to pad plus unedited copter tape.
Add to clipboard
NASA/KSC video release, May 26, 1983 : STS-7 Challenger, roll to pad plus unedited copter tape.
NASA/KSC video release, April 16, 1983 : STS-6 Challenger landing at DFRF, Sat. Apr. 9, 1:53 pm EST, 1983.
Add to clipboard
NASA/KSC video release, April 16, 1983 : STS-6 Challenger landing at DFRF, Sat. Apr. 9, 1:53 pm EST, 1983.
"A"/3 ECP 1000.
Add to clipboard
"A"/3 ECP 1000.
Alien - dealer version.
Add to clipboard
Alien - dealer version.
Mrs. Heather Rowe : summer in Canada.
Add to clipboard
Mrs. Heather Rowe : summer in Canada.
Electrohome, reel 3, 5 spots.
Add to clipboard
Electrohome, reel 3, 5 spots.
Electrohome, reel 1, 60 spots.
Add to clipboard
Electrohome, reel 1, 60 spots.
It's new, it's blue TV - dealer with tag.
Add to clipboard
It's new, it's blue TV - dealer with tag.
Electrohome, reel 4, 7 spots.
Add to clipboard
Electrohome, reel 4, 7 spots.
It's new, it's blue TV - national; Alien - national.
Add to clipboard
It's new, it's blue TV - national; Alien - national.
It's new, it's blue TV - Hill's.
Add to clipboard
It's new, it's blue TV - Hill's.
It's new, it's blue TV; Alien dealer.
Add to clipboard
It's new, it's blue TV; Alien dealer.
Alien, dealer with tag.
Add to clipboard
Alien, dealer with tag.
Alien - dealer with tag.
Add to clipboard
Alien - dealer with tag.
Alien - dealer version.
Add to clipboard
Alien - dealer version.
Alien - dealer version.
Add to clipboard
Alien - dealer version.
It's new, it's blue TV; Alien dealer.
Add to clipboard
It's new, it's blue TV; Alien dealer.
NASA/KSC video release, April 21, 1983 : STS-7 Challenger, roll from OPF to the VAB : unedited field tape.
Add to clipboard
NASA/KSC video release, April 21, 1983 : STS-7 Challenger, roll from OPF to the VAB : unedited field tape.
A - ECP 1000.
Add to clipboard
A - ECP 1000.
It's new, it's blue TV.
Add to clipboard
It's new, it's blue TV.
Dare Foods Limited : cookies competitive reel / [produced by] D’Arcy Masius Benton & Bowles Canada Inc.
Add to clipboard
Dare Foods Limited : cookies competitive reel / [produced by] D’Arcy Masius Benton & Bowles Canada Inc.