Showing 938 results

Archival description
Print preview View:
Electrohome Ltd. : Lowater & ECP 1000.
Electrohome Ltd. : Lowater & ECP 1000.
It's new, it's blue TV.
It's new, it's blue TV.
Lowater commercial (French inserts), April 23, 1984.
Lowater commercial (French inserts), April 23, 1984.
Electrohome tape 1 : Deilcraft, Motor, Planar, dish.
Electrohome tape 1 : Deilcraft, Motor, Planar, dish.
Editcomm : new demo tape.
Editcomm : new demo tape.
Electrohome : "productivity."
Electrohome : "productivity."
John Pollock interview : Sunday AM.
John Pollock interview : Sunday AM.
Electrohome Ltd. : Lowater & ECP 1000.
Electrohome Ltd. : Lowater & ECP 1000.
Alien.
Alien.
It's new, it's blue TV.
It's new, it's blue TV.
It's new, it's blue TV.
It's new, it's blue TV.
Dare cookies, November 19, 1984 / [produced by] Benton & Bowles Canada Ltd.
Dare cookies, November 19, 1984 / [produced by] Benton & Bowles Canada Ltd.
Annual report, 1984.
Annual report, 1984.
The Electrohome breakthrough : ECP 1000 color projection system (animation).
The Electrohome breakthrough : ECP 1000 color projection system (animation).
Lowater commercial (English only) : April 31, 1984.
Lowater commercial (English only) : April 31, 1984.
Printed circuit boards being made, AABEX R & O centre, AABEX van, computer room, CAP - Dubner, control room, audio, downstairs editing.
Printed circuit boards being made, AABEX R & O centre, AABEX van, computer room, CAP - Dubner, control room, audio, downstairs editing.
Presenting the ECP 1000.
Presenting the ECP 1000.
STS-6 Downlink Spacecraft TV, April 4, 6, 1983.
STS-6 Downlink Spacecraft TV, April 4, 6, 1983.
NASA/KSC video release, April 15, 1983 : STS-6 Challenger 15 min. tape pre-launch, launch, sat. dep. EVA and landing.
NASA/KSC video release, April 15, 1983 : STS-6 Challenger 15 min. tape pre-launch, launch, sat. dep. EVA and landing.
B reel - ECP 1000.
B reel - ECP 1000.
"A"/2 ECP 1000.
"A"/2 ECP 1000.
ECP 1000 road show, 2 cuts : Dave Lowater, Anahiem : low audio.
ECP 1000 road show, 2 cuts : Dave Lowater, Anahiem : low audio.
Dealer versions of "blue TV" and "alien."
Dealer versions of "blue TV" and "alien."
Electrohome, reel 2, 64 spots.
Electrohome, reel 2, 64 spots.
On its own.
On its own.
NASA/KSC video release, April 6, 1983 : STS-6 Challenger pre-launch, launch and isolated cameras.
NASA/KSC video release, April 6, 1983 : STS-6 Challenger pre-launch, launch and isolated cameras.
NASA/KSC video release, May 26, 1983 : STS-7 Challenger, roll to pad plus unedited copter tape.
NASA/KSC video release, May 26, 1983 : STS-7 Challenger, roll to pad plus unedited copter tape.
NASA/KSC video release, April 16, 1983 : STS-6 Challenger landing at DFRF, Sat. Apr. 9, 1:53 pm EST, 1983.
NASA/KSC video release, April 16, 1983 : STS-6 Challenger landing at DFRF, Sat. Apr. 9, 1:53 pm EST, 1983.
"A"/3 ECP 1000.
"A"/3 ECP 1000.
Alien - dealer version.
Alien - dealer version.
Mrs. Heather Rowe : summer in Canada.
Mrs. Heather Rowe : summer in Canada.
Electrohome, reel 3, 5 spots.
Electrohome, reel 3, 5 spots.
Electrohome, reel 1, 60 spots.
Electrohome, reel 1, 60 spots.
It's new, it's blue TV - dealer with tag.
It's new, it's blue TV - dealer with tag.
Electrohome, reel 4, 7 spots.
Electrohome, reel 4, 7 spots.
It's new, it's blue TV - national; Alien - national.
It's new, it's blue TV - national; Alien - national.
It's new, it's blue TV - Hill's.
It's new, it's blue TV - Hill's.
It's new, it's blue TV; Alien dealer.
It's new, it's blue TV; Alien dealer.
Alien, dealer with tag.
Alien, dealer with tag.
Alien - dealer with tag.
Alien - dealer with tag.
Alien - dealer version.
Alien - dealer version.
Alien - dealer version.
Alien - dealer version.
It's new, it's blue TV; Alien dealer.
It's new, it's blue TV; Alien dealer.
NASA/KSC video release, April 21, 1983 : STS-7 Challenger, roll from OPF to the VAB : unedited field tape.
NASA/KSC video release, April 21, 1983 : STS-7 Challenger, roll from OPF to the VAB : unedited field tape.
A - ECP 1000.
A - ECP 1000.
Electrohome 75th anniversary presentation : "people."
Electrohome 75th anniversary presentation : "people."
NASA/KSC video release, Nov. 30, 1982 : STS-6 Challenger move from OPF to VAB for stacking and mate then roll to pad-39 & chopper.
NASA/KSC video release, Nov. 30, 1982 : STS-6 Challenger move from OPF to VAB for stacking and mate then roll to pad-39 & chopper.
The AABEX story : dubbed April, 1982.
The AABEX story : dubbed April, 1982.
The AABEX story : dubbed for Electrohome.
The AABEX story : dubbed for Electrohome.
The AABEX story : dubbed April, 1982.
The AABEX story : dubbed April, 1982.
Electrohome 75th anniversary presentation : "people."
Electrohome 75th anniversary presentation : "people."
Camp Clover.
Camp Clover.
Guelph Dam : micro hydro opening ceremony, 1982 : print #1 / Maclean Hunter Cable TV, Channel 8 cablecast, Guelph.
Guelph Dam : micro hydro opening ceremony, 1982 : print #1 / Maclean Hunter Cable TV, Channel 8 cablecast, Guelph.
Feb. 25, 1982 : Westar D/Delta 106 launch time 7:04 pm-EST., switcher out + Westar showing.
Feb. 25, 1982 : Westar D/Delta 106 launch time 7:04 pm-EST., switcher out + Westar showing.
CAP control room, CFCA, CKKW control rooms, warehouse exteriors with trucks, Deilcraft exteriors, Deilcraft interiors, raw lumber, crating furniture, etc.
CAP control room, CFCA, CKKW control rooms, warehouse exteriors with trucks, Deilcraft exteriors, Deilcraft interiors, raw lumber, crating furniture, etc.
Wellington Street employees walking out, engineering, drafting, AABEX.
Wellington Street employees walking out, engineering, drafting, AABEX.
STS-3, Mar. 30, 1982 : landing, SW.O.
STS-3, Mar. 30, 1982 : landing, SW.O.
The AABEX story : dubbed April, 1982.
The AABEX story : dubbed April, 1982.
"People" : 75th anniversary.
"People" : 75th anniversary.
Electrohome tape #4 : 75th anniversary.
Electrohome tape #4 : 75th anniversary.
NASA/KSC video release, September 15, 1982 : STS-4, the final test flight.
NASA/KSC video release, September 15, 1982 : STS-4, the final test flight.
Electrohome #7 (not finished), switchboard, mailroom, computer, circuit boards, TVs being tested, computer room.
Electrohome #7 (not finished), switchboard, mailroom, computer, circuit boards, TVs being tested, computer room.
The AABEX story : dubbed April, 1982.
The AABEX story : dubbed April, 1982.
Electrohome tape #4 : 75th anniversary.
Electrohome tape #4 : 75th anniversary.
Deilcraft interiors, furniture assembly showroom, Motor Division interiors.
Deilcraft interiors, furniture assembly showroom, Motor Division interiors.
Dubner Graphics : ECP projector, productive information technoloyg, various Dubner examples.
Dubner Graphics : ECP projector, productive information technoloyg, various Dubner examples.
NASA/KSC STS-3 : the complete mission, April 12, 1982, Newton/Cottee version.
NASA/KSC STS-3 : the complete mission, April 12, 1982, Newton/Cottee version.
NASA/KSC May 26, 1982 : Columbia, STS-4 roll out to pad.
NASA/KSC May 26, 1982 : Columbia, STS-4 roll out to pad.
NASA/KSC video release, Sept. 15, 1982 : STS-4, the final test flight.
NASA/KSC video release, Sept. 15, 1982 : STS-4, the final test flight.
Electrohome : people - Tenessee.
Electrohome : people - Tenessee.
People, 75th anniversary.
People, 75th anniversary.
STS-2 astro arrival, breakfast, suit-up, caravan, white room.
STS-2 astro arrival, breakfast, suit-up, caravan, white room.
Electrohome shuttle coverage #2 : countdown to T-31 second HOLD.
Electrohome shuttle coverage #2 : countdown to T-31 second HOLD.
Gully erosion ; Barleyhead weeds ; Elora Gorge from bridge / Summit Productions [for the Grand River Conservation Authority].
Gully erosion ; Barleyhead weeds ; Elora Gorge from bridge / Summit Productions [for the Grand River Conservation Authority].
Annual report : masters, 1981-1985.
Annual report : masters, 1981-1985.
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 1 of 2)
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 1 of 2)
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 2 of 2)
Upper and lower Grand / Summit Films [for the Grand River Conservation Authority], August, 1981. (can 2 of 2)
GRCA information night, Paris, June 5, 1981 / recorded by Jarmain Cable TV, Brantford, print #1.
GRCA information night, Paris, June 5, 1981 / recorded by Jarmain Cable TV, Brantford, print #1.
Electrohome shuttle coverage #4 : launch coverage from stands & NASA feed.
Electrohome shuttle coverage #4 : launch coverage from stands & NASA feed.
Resource management camp / Summit Film Productions [for the Grand River Conservation Authority], September 28, 1981.
Resource management camp / Summit Film Productions [for the Grand River Conservation Authority], September 28, 1981.
GRCA videocassettes transferred to DVDs.
GRCA videocassettes transferred to DVDs.
On its own.
On its own.
Complete STS-1 mission, 1st arrival thru return to OPF, March 24, 1979, April 29, 1981.
Complete STS-1 mission, 1st arrival thru return to OPF, March 24, 1979, April 29, 1981.
STS-2 isolated cameras : copy.
STS-2 isolated cameras : copy.
STS-2 unedited (master) landing, Nov. 14, 1981.
STS-2 unedited (master) landing, Nov. 14, 1981.
STS-2 SRB recovery, 4 1/2 min. audio ch. 1, Nov. 17, 1981.
STS-2 SRB recovery, 4 1/2 min. audio ch. 1, Nov. 17, 1981.
Electrohome shuttle coverage #1 : pre-launch coverage.
Electrohome shuttle coverage #1 : pre-launch coverage.
Corporate film : the changing world of Electrohome : print #3.
Corporate film : the changing world of Electrohome : print #3.
Flooding / [Summit Film Productions for the Grand River Conservation Authority].
Flooding / [Summit Film Productions for the Grand River Conservation Authority].
Grand River Conservation Authority : annual reports , 1981 to 1986 (disc 1 of 2).
Grand River Conservation Authority : annual reports , 1981 to 1986 (disc 1 of 2).
Corporate film : the changing world of Electrohome : print #2.
Corporate film : the changing world of Electrohome : print #2.
The changing world of Electrohome : print #1.
The changing world of Electrohome : print #1.
Electrohome shareholder presentation, May, 1981.
Electrohome shareholder presentation, May, 1981.
STS-2 landing, Nov. 14, 1981.
STS-2 landing, Nov. 14, 1981.
Electrohome shuttle coverage #3 : pre-launch coverage second try.
Electrohome shuttle coverage #3 : pre-launch coverage second try.
The changing world of Electrohome.
The changing world of Electrohome.
#9 Electrohome : CAP exterior, master control and tapes (2:00).
#9 Electrohome : CAP exterior, master control and tapes (2:00).
STS-2 complete mission.
STS-2 complete mission.
Advertel : to Gord Ogland, Enterprise, 151 Bloor W., #701 Toronto, Ont.
Advertel : to Gord Ogland, Enterprise, 151 Bloor W., #701 Toronto, Ont.
#1 corporate image, stereo & TV presentation.
#1 corporate image, stereo & TV presentation.
Results 401 to 500 of 938