<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE ead PUBLIC "+//ISBN 1-931666-00-8//DTD ead.dtd (Encoded Archival Description (EAD) Version 2002)//EN" "http://lcweb2.loc.gov/xmlcommon/dtds/ead2002/ead.dtd">
<ead>
  <eadheader langencoding="iso639-2b" countryencoding="iso3166-1" dateencoding="iso8601" repositoryencoding="iso15511" scriptencoding="iso15924" relatedencoding="DC">
    <eadid identifier="engineering-iv-change-orders" url="https://archives.uwaterloo.ca/index.php/engineering-iv-change-orders" encodinganalog="identifier">999</eadid>
    <filedesc>
      <titlestmt>
        <titleproper encodinganalog="title">Engineering IV: Change Orders</titleproper>
      </titlestmt>
      <publicationstmt>
        <publisher encodinganalog="publisher">University of Waterloo Archives</publisher>
        <address>
          <addressline>200 University Avenue West</addressline>
          <addressline>Waterloo</addressline>
          <addressline>Ontario</addressline>
          <addressline>N2L 3G1</addressline>
          <addressline>Email: archives@uwaterloo.ca</addressline>
          <addressline>https://uwaterloo.ca/lib-special-collections-archives/collections/university-waterloo-archives</addressline>
        </address>
        <date normal="2025-09-17" encodinganalog="date">2025-09-17</date>
      </publicationstmt>
    </filedesc>
    <profiledesc>
      <creation>
      Generated by Access to Memory (AtoM) 2.9.1      <date normal="2026-09-11">2026-09-11 14:22 UTC</date>
    </creation>
      <langusage>
        <language langcode="eng">English</language>
      </langusage>
    </profiledesc>
  </eadheader>
  <archdesc level="file" relatedencoding="rad">
    <did>
      <unittitle encodinganalog="1.1B">Engineering IV: Change Orders</unittitle>
      <unitid encodinganalog="1.8B11">UWA7-87-0027-9-1-999</unitid>
      <unitdate id="atom_3043239_event" normal="1972/1972" encodinganalog="1.4B2">1972</unitdate>
      <repository>
        <corpname>University of Waterloo Archives</corpname>
        <address>
          <addressline>200 University Avenue West</addressline>
          <addressline>Waterloo</addressline>
          <addressline>Ontario</addressline>
          <addressline>N2L 3G1</addressline>
          <addressline>Email: archives@uwaterloo.ca</addressline>
          <addressline>https://uwaterloo.ca/lib-special-collections-archives/collections/university-waterloo-archives</addressline>
        </address>
      </repository>
      <langmaterial encodinganalog="1.8B9a">
        <language langcode="eng">English</language>
      </langmaterial>
      <origination encodinganalog="1.4D">
                                                              </origination>
    </did>
    <bioghist id="md5-636744da6f4b31f4b3884e02dc5197eb" encodinganalog="1.7B">
      <note>
        <p>Plant Operations oversees the maintenance, repair, renovation, and improvement of campus spaces, spanning 70 buildings and 1,112 acres of land.</p>
      </note>
    </bioghist>
    <odd type="publicationStatus">
      <p>Published</p>
    </odd>
    <controlaccess>
      <name role="subject">Carl A. Pollock Hall</name>
      <geogname>Waterloo</geogname>
    </controlaccess>
    <acqinfo encodinganalog="1.8B12">
      <p>Transferred by Plant Operations in March 1987.</p>
    </acqinfo>
    <accessrestrict encodinganalog="1.8B16a">
      <p>Files are in off-site storage. Please allow up to two weeks notice for access to these files.</p>
    </accessrestrict>
    <dsc type="combined">

        
    
  </dsc>
  </archdesc>
</ead>
